ukenru

Representation in Eastern Europe:

Phone: + 380 63 171 62 63
Mobile phone: + 380 67 445 11 27
info@epikurgroup.com

CHP, working on gas

Print this page

No. 02601 CHP, which
works on gas. Power: 42 kW + 7 kW.
Steam productivity: 105 t/h

  • Features
  • Photos
  • Make a request

Gas-fired thermal power plant:

The plant will be in continuous operation, supplying electricity and steam to a nearby paper mill. The plant is due to close in April 2013, after which it will be ready for transport. All parts are sold as is with no additional warranties. Transportation is handled by the Buyer.

The plant was built in 1995/96 to replace the boilers. Commissioned in 1997.

Aero-derivative gas turbine "GE LM6000PA".

Power: 42 MW + 7 MW due to the back pressure of the Siemens steam turbine.

Steam productivity: 105 t/h (permanent, short-term - 120 t/h).



Railway turbine exhausts in Nooter Erickson are regeneration steam generator (HRSG), but can also exhaust directly into the atmosphere through the blast stack. This allows the gas turbine to run in standstill mode if the HRSG is not available. The HRSG has additional gas burners which can be done in addition to the gas turbine or can be done without the gas turbine using forced draft (FD) fans to get the known Air. This adds considerable flexibility to the plant.

EQUIPMENT LIST
• 1 x General Electric (GE) model LM6000PA Gas Turbine (GT) with water injection coupled to Brush alternator rated at 42 MW output. GT is able to be covered with natural gas or distillate fuel.
• 1 x GT MK V control unit and associated auxiliary systems.
• 1 x Nooter Erikson Heat Recovery Steam Generator (HRSG) which is powered by high flow from GT and capable of additional supply with natural gas or distillate fuel. Maximum steam output 105 tne steam/hour.
• 1 x Water treatment plant consisting of 2 100% twin bed resin exchange units and 2 mixed bed units (for GT water injection) complete with all auxiliary systems including chemical storage and effluent tanks.
• 1 x Siemens back pressure steam turbine driven generator installed at 7 MW output.
• 2 x Bellis and Morcom 3 age reciprocating natural gas compressors, functions as one walk and space.
• 1 x distillate oil tank, capacity 1,500,000 liters.
• 1 x Heavy Fuel Oil tank accessories and combined fuel pumps and pipe work.
• 2 x 11/132 kV transformers rated at 40 MVA.
• 1 x standby diesel generator.
• 1 x Serck Distributed Control System (DCS).
• 3 x Control and general service air compressors.
• 1 x Boiler chemical dosing system.
• 1 x CBISS Continuous Emissions Monitoring System (CEMS) for monitoring and recording stack gas emissions.
• 1 x Cooling tower complete with dump condenser cooling water pumps dosing systems and auxiliaries.
• 1 x CHP control building and facilities within.
• 1 x Additional office building.
• 1 x installed fire detection and suppression system.
• 1 x established security and communication technology.
• 1 x installed gas detection system.
• All MP and LP steam pressure reducing stations and associated equipment.
• All debugged cables, converters and switches directed to what is mentioned in the plant.
• The most frequent parts are necessary for the machine range.
• Extensive manuals, records and drawings as available.

PERFORMANCE
The CHP plant had a steam delivery availability of around 97% for 2011. They will not have any Maidan outages, planned or unplanned, in 2012 to date. The amount of capacity and scope of production over the old year is available.

 



Equipment that interests you 
Comments 
First Name Last Name 
Organization 
E-mail 
Contact phone 
    
To order this equipment, contact info@epikurgroup.com
Equipment that interests you 
Comments 
First Name Last Name 
Organization 
E-mail 
Contact phone 
Please enter the following gujkedec Help us prevent SPAM!